Capacity Planning based on Production Order
The Capacity Planning functionality aids in monitoring production jobs assigned to each workstation.
Follow are the steps to use Capacity Planning Feature in your BizCentric account.
Operations
To add operations, go to:
Manufacturing > Bill of Materials > Operations
Workstation
Add each Workstation in your BizCentric account from:
Manufacturing > Bill of Materials > Workstation
In the Workstation master, you can specify the operations to be conducted on it, associated costs, and the working hours of the workstation.
Bill of Materials (BOM)
In a BOM, with the list of raw material needed, for manufacturing, you can also list operation and workstations through which those raw materials will be processed.
Production Order
On submission of Production Order, Timesheet for Operations. This feature aids in allocating production tasks to each workstation, and it also allows for the updating of the actual time taken for each operation.
—