Knowledge Base

Update Date Field Based On Value In Other Date Field

  • 68views
  • February 7, 2024

Update Date Field Based On Value In Other Date Field

The Script automatically populates the date field based on another date field’s value.

For instance, suppose we need to set the Production Due Date as two days before the Delivery Date. Assuming that the Delivery Date for a project has been specified and that there’s already a field labeled ‘Production Due Date‘ as a ‘Date’ type present in the form, applying this script will ensure that the Production Due Date is automatically adjusted to two days before the delivery date.